Electromaps
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayThe drive from Warsaw to Riva del Garda is 1,403 km. Austria accounts for 498 km across two sections, 389 km and 109 km, separated by 95 km in Germany; the final 186 km run through Italy.
Vignettes are required in Czechia and Austria, while Germany's federal toll does not apply to ordinary passenger cars. The Austrian A13 over the Brenner has a section toll. Italy's A22 charges according to distance travelled towards Rovereto Sud.
Route
Route data: © OpenStreetMap contributors.
Poland388 km · 3 h 58 min
Main roads: 7, 78, A1, A2, S2, S8
Czechia237 km · 2 h 43 min
Main roads: 152, 52, 67, 78, B7, D1, D2
Austria389 km · 4 h 7 min
Main roads: A1, A22, A5, B1, B7, S1, S33, S5
Germany95 km · 58 min
Main roads: A 8, A 93, B 21
Austria109 km · 1 h 25 min
Main roads: A12, A13
Italy186 km · 2 h 14 min
Main roads: A22, SS240
| Country | Distance | Driving time | Main roads |
|---|---|---|---|
| Poland | 388 km | 3 h 58 min | 7, 78, A1, A2, S2, S8 |
| Czechia | 237 km | 2 h 43 min | 152, 52, 67, 78, B7, D1, D2 |
| Austria | 389 km | 4 h 7 min | A1, A22, A5, B1, B7, S1, S33, S5 |
| Germany | 95 km | 58 min | A 8, A 93, B 21 |
| Austria | 109 km | 1 h 25 min | A12, A13 |
| Italy | 186 km | 2 h 14 min | A22, SS240 |
Charging along the route
Longest stretch without a ≥150 kW site on the route: 255 kilometres (km 416–671, Czechia and Austria).
This stretch relies on community data, which may be incomplete.
EvCompassHow we calculate →
46 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
EIPA
1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
16 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
7 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
8 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
15 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
Models
| Vehicle version | Winter · −10 °C | Summer · 23 °C | ||||
|---|---|---|---|---|---|---|
| Stops | Charging time | Total cost | Stops | Charging time | Total cost | |
| 6 stops | 2 h 46 min | up to PLN 860 By country
| 4 stops | 1 h 50 min | up to PLN 550 By country
| |
| 6 stops | 2 h 46 min | up to PLN 861 By country
| 4 stops | 1 h 50 min | up to PLN 521 By country
| |
Prices and road charges
EvCompassHow we calculate →
Priced one-way road charges for a passenger BEV: PLN 96. Not included: A22 (Brennero–Rovereto Sud).
National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.
EIPA
No fixed road charge applies to this route.
IONITY: up to 22.68 CZK/kWh (list price, no subscription); up to 4.05 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
No fixed road charge applies to this route.
Publisher information checked September 24, 2026
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayPublisher: Elocity Sp. z o.o.
Countries: 1 country
App StoreGoogle PlayPublisher: GreenWay Slovensko s. r. o.
Countries: 3 countries
App StoreGoogle PlayPublisher: ANWIM S.A.
Countries: 1 country
App StoreGoogle PlayAssumptions
EvCompassHow we calculate →