Skip to content
EvCompass

Croatia: Split

12 versions with route calculations

The drive from Warsaw to Split is 1,466 km. Its longest single leg runs through Croatia and measures 465 km; the remaining sections pass through Poland, Czechia, Austria and Slovenia.

E-vignettes apply on motorways in Czechia, Austria and Slovenia. Croatian motorways charge by the distance between toll points and by vehicle category. The route crosses Slovenia on a 60 km stretch, and the Slovenian e-vignette is sold for 7 days, a month or a year.

Route

Distance and driving time

Total distance
1,466 km
Total driving time
16 h 4 min

Route data: © OpenStreetMap contributors.

  • Poland388 km · 3 h 58 min

    Main roads: 7, 78, A1, A2, S2, S8

  • Czechia237 km · 2 h 43 min

    Main roads: 152, 52, 67, 78, B7, D1, D2

  • Austria317 km · 3 h 38 min

    Main roads: 437, A1, A2, A23, A5, A9, B7, S1, S2

  • Slovenia60 km · 40 min

    Main roads: A1, A4

  • Croatia465 km · 5 h 5 min

    Main roads: A1, A2, A4, D1, D410, D8

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 255 kilometres (km 416–671, Czechia and Austria).

This stretch relies on community data, which may be incomplete.

EvCompassHow we calculate →

  • Poland

    46 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (46)
    • km 0–15 · Warszawa · 15 sites · up to 400 kW · Polenergia eMobility sp. z o.o., GreenWay Polska Sp. z o.o., ORLEN S.A. and 8 more
    • km 27 · Galeria Brwinów, Warsaw · ELECTRIP POLAND SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ · 180 kW
    • km 85 · Stacja Paliw Orlen Łyszkowice · GreenWay Polska Sp. z o.o. · 200 kW
    • km 103 · Nowostawy · 2 sites · up to 350 kW · IONITY GmbH Sp. z o.o.
    • km 114 · Nowe Skoszewy · 2 sites · up to 210 kW · EKOEN Sp. z o.o.
    • km 125 · Łódź · 4 sites · up to 200 kW · GreenWay Polska Sp. z o.o. (Volvo Łódź Bednarek), Bednarek Sp. z o. o., and GreenWay Polska Sp. z o.o.
    • km 162–165 · Piotrków Trybunalski · 5 sites · up to 400 kW · GreenWay Polska Sp. z o.o., KLIF ENERGY SPÓŁKA Z O.O., SPÓŁKA KOMANDYTOWA, ORLEN S.A. and 1 more
    • km 204–207 · Radomsko · 6 sites · up to 600 kW · ORLEN S.A., ANWIM S.A., GreenWay Polska Sp. z o.o. and 1 more
    • km 297 · Dobieszowice · 2 sites · up to 150 kW · GreenWay Polska Sp. z o.o.
    • km 304–308 · Piekary Śląskie · 2 sites · up to 400 kW · GreenWay Polska Sp. z o.o.
    • km 318 · Handlowa 2B, 41-807 Zabrze · Wichary Technic spółka z ograniczoną odpowiedzialnością spółka komandytowa · 150 kW
    • km 326 · M1 Zabrze · GreenWay Polska Sp. z o.o. · 150 kW
    • km 349 · Główna 1D, 44-237 Bełk · NOXO ENERGY Sp. z o.o. · 180 kW
    • km 357 · TAURON Żory Północna-al. Armi Krajowej (Stacja paliw) · TAURON Nowe Technologie S.A. · 150 kW
    • km 380–381 · Łaziska · 2 sites · up to 400 kW · UNIWAR sp. z o. o. and ANWIM S.A.
    Map Poland: 46 stations in the corridor
  • Czechia

    1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW site on the route (1)
    • km 416 · Ionity Ostrava · 350 kW
    Map Czechia: 1 station in the corridor
  • Austria

    6 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (6)
    • km 671 · IONITY Hochleithen, Wolfpassing an der Hochleithen · 350 kW
    • km 696 · Tesla Supercharger Wien · 250 kW
    • km 712 · TPV Hypercharger, Wien · 150 kW
    • km 812 · Wirtschaftspark West, Pinkafeld · Ionity · 350 kW
    • km 827 · Tesla Supercharger Hartberg · 250 kW
    • km 895 · Autohof Leitner, Feldkirchen bei Graz · SMATRICS Netz · 300 kW
    Map Austria: 6 stations in the corridor
  • Slovenia

    2 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (2)
    • km 951 · Pesnica pri Mariboru · 2 sites · up to 350 kW · Ionity
    Map Slovenia: 2 stations in the corridor
  • Croatia

    20 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (20)
    • km 1,025 · IONITY Roses Outlet, Vrankovec · 350 kW
    • km 1,062 · Zagreb · 2 sites · up to 400 kW · PlugSurfing
    • km 1,087–1,091 · Donji Desinec · 2 sites · up to 300 kW · PETROL and Tesla
    • km 1,108 · Karlovac · 2 sites · up to 400 kW · Be Energised
    • km 1,124 · Odmorište Vukova Gorica Jug, Straža · Elen · 175 kW
    • km 1,229 · Odmoriste Jance Zapad 2 · 2 sites · up to 250 kW · Tesla
    • km 1,250 · Ionity Gospic, Grad Gospić · 350 kW
    • km 1,270 · Zir - istok, Mogorić · Elen · 175 kW
    • km 1,329 · Zemunik Gornji · 2 sites · up to 350 kW · Ionity and Tesla
    • km 1,384 · Dubravice · 2 sites · up to 200 kW · PETROL
    • km 1,449–1,450 · Dugopolje · 2 sites · up to 300 kW · PETROL
    • km 1,462–1,463 · Split · 2 sites · up to 180 kW · Electrip and PlugSurfing
    Map Croatia: 20 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

One-way road charges for a passenger BEV: PLN 255.

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

No fixed road charge applies to this route.

Czechia

  • IONITY: up to 22.68 CZK/kWh (list price, no subscription); up to 4.05 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Austria

  • IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Slovenia

  • IONITY: up to 0.78 EUR/kWh (list price, no subscription); up to 3.38 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Croatia

  • IONITY: up to 0.81 EUR/kWh (list price, no subscription); up to 3.51 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 91 km/h.

Other routes

Other destinations

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy