Skip to content
EvCompass

Slovakia: Štrbské Pleso

12 versions with route calculations

The drive from Warsaw to Štrbské Pleso is 507 km: 395 km in Poland and 112 km in Slovakia. On the Polish side most of the drive is on the S7 expressway, and in Slovakia the route uses the D1 motorway and the R3 expressway.

A passenger car needs an e-vignette on Slovak motorways. Its validity is chosen to match the stay: 1 day, 10 days, 30 days or 365 days.

Route

Distance and driving time

Total distance
477 km
Total driving time
5 h 56 min

Route data: © OpenStreetMap contributors.

  • Poland365 km · 4 h 7 min

    Main roads: 5, 52, 59, 7, A4

  • Slovakia112 km · 1 h 49 min

    Main roads: 18, 520, 537, 538, 584, 584A, 59, D1, R3

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 38 kilometres (km 131–169, Poland).

EvCompassHow we calculate →

  • Poland

    46 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (46)
    • km 0–10 · Wrocław · 13 sites · up to 320 kW · GreenWay Polska Sp. z o.o., Eleport Sp. z o.o., Porsche Centrum Wrocław Lellek Group and 2 more
    • km 35 · Brzezimierz 15, 55-216 Brzezimierz · ANWIM S.A. · 400 kW
    • km 51 · Młodoszowice gm. Grodków · 2 sites · up to 400 kW · GreenWay Polska Sp. z o.o.
    • km 58 · MOP Jankowice, Jankowice Wielkie · GreenWay Polska Sp. z o.o. · 400 kW
    • km 76–77 · Rzędziwojowice · 2 sites · up to 350 kW · IONITY GmbH Sp. z o.o.
    • km 96 · MOP Przysiecz · GreenWay Polska Sp. z o.o. · 400 kW
    • km 102 · Shell Posiłek, Rogów Opolski · GreenWay Polska Sp. z o.o. · 150 kW
    • km 131 · BP Olszowa · GreenWay Polska Sp. z o.o. · 200 kW
    • km 169 · Shell Recharge 3002 Gliwice Rybnicka · Shell Polska Sp z o.o. · 400 kW
    • km 191–204 · Katowice · 8 sites · up to 400 kW · Porsche Centrum Katowice Lellek Group, GreenWay Polska Sp. z o.o. (Auto Boss), Eleport Sp. z o.o. and 4 more
    • km 226–230 · Trzebinia · 3 sites · up to 400 kW · GreenWay Polska Sp. z o.o. and F.H.U "ATOL" Agata Bolek
    • km 261–276 · Kraków · 7 sites · up to 540 kW · Pevna Energy Prosta Spółka Akcyjna, Hazel spółka z o.o., Eleport Sp. z o.o. and 3 more
    • km 296–297 · Myślenice · 2 sites · up to 200 kW · Power Dot Poland Sp. z o.o. and Eleport Sp. z o.o.
    • km 309 · BeReady2GO PCIM/Zakopianka · 160 kW
    • km 325 · Naprawa 574, 34-240 Naprawa · ANWIM S.A. · 400 kW
    • km 331 · Chabówka 82A, 34-700 Rabka Zdrój · ANWIM S.A. · 400 kW
    Map Poland: 46 stations in the corridor
  • Slovakia

    0 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    No data sources.

    Map Slovakia: 0 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

One-way road charges for a passenger BEV: PLN 71.

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

Slovakia

  • IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 80 km/h.

Other routes

Other destinations

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy