Skip to content
EvCompass

Slovakia: Štrbské Pleso

4 versions with route calculations

The drive from Warsaw to Štrbské Pleso is 507 km: 395 km in Poland and 112 km in Slovakia. On the Polish side most of the drive is on the S7 expressway, and in Slovakia the route uses the D1 motorway and the R3 expressway.

A passenger car needs an e-vignette on Slovak motorways. Its validity is chosen to match the stay: 1 day, 10 days, 30 days or 365 days.

Route

Distance and driving time

Total distance
507 km
Total driving time
6 h 41 min

Route data: © OpenStreetMap contributors.

  • Poland395 km · 4 h 52 min

    Main roads: 52, 59, 7, 79, A4, S52, S7

  • Slovakia112 km · 1 h 49 min

    Main roads: 18, 520, 537, 538, 584, 584A, 59, D1, R3

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 55 kilometres (km 66–121, Poland).

EvCompassHow we calculate →

  • Poland

    44 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (44)
    • km 0–14 · Warszawa · 19 sites · up to 360 kW · EKOEN Sp. z o.o., Polenergia eMobility sp. z o.o., NOXO ENERGY Sp. z o.o. and 10 more
    • km 50 · KFC Grójec Skurów · GreenWay Polska Sp. z o.o. · 150 kW
    • km 66 · Promna-Kolonia · 2 sites · up to 400 kW · GreenWay Polska Sp. z o.o. and ELECTRIP POLAND SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    • km 121 · Czerwienica 25, 26-502 Jastrząb · NOXO ENERGY Sp. z o.o. · 180 kW
    • km 132 · S7 MOP Barak Wschód · ELECTRIP POLAND SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ · 400 kW
    • km 141 · Aldi Skarżysko-Kamienna Popiełuszki · GreenWay Polska Sp. z o.o. · 400 kW
    • km 173 · Kielce · 2 sites · up to 400 kW · Autorud Stalowa Wola sp z o.o. and ANWIM S.A.
    • km 185 · Shell Recharge 3505 Szewce Wschod, Nowiny · Shell Polska Sp z o.o. · 300 kW
    • km 201 · HUB ładowania ORLEN Stacja Paliw Brzegi SŁ8279 · ORLEN S.A. · 400 kW
    • km 220 · Potok Mały · 2 sites · up to 400 kW · Power Dot Poland Sp. z o.o. and ANWIM S.A.
    • km 254 · ChargeIn Intermarche Miechów DC · ChargeIn CPO · 150 kW
    • km 291 · Podium Park Kraków · GreenWay Polska Sp. z o.o. · 150 kW
    • km 297–306 · Kraków · 6 sites · up to 540 kW · Budimex Mobility Spółka Akcyjna, GreenWay Polska Sp. z o.o. (Grupa PGD Spółka z ograniczoną odpowiedzialnością Sp. K.), ORLEN S.A. and 3 more
    • km 326–327 · Myślenice · 2 sites · up to 200 kW · Power Dot Poland Sp. z o.o. and Eleport Sp. z o.o.
    • km 339 · BeReady2GO PCIM/Zakopianka · 160 kW
    • km 355 · Naprawa 574, 34-240 Naprawa · ANWIM S.A. · 400 kW
    • km 361 · Chabówka 82A, 34-700 Rabka Zdrój · ANWIM S.A. · 400 kW
    Map Poland: 44 stations in the corridor
  • Slovakia

    0 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    No data sources.

    Map Slovakia: 0 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

One-way road charges for a passenger BEV: PLN 35.

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

No fixed road charge applies to this route.

Slovakia

  • IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 76 km/h.

Other routes

Other destinations

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy