Skip to content
EvCompass

Italy: Riva del Garda

3 versions with route calculations

The drive from Warsaw to Riva del Garda is 1,403 km. Austria accounts for 498 km across two sections, 389 km and 109 km, separated by 95 km in Germany; the final 186 km run through Italy.

Vignettes are required in Czechia and Austria, while Germany's federal toll does not apply to ordinary passenger cars. The Austrian A13 over the Brenner has a section toll. Italy's A22 charges according to distance travelled towards Rovereto Sud.

Route

Distance and driving time

Total distance
1,107 km
Total driving time
11 h 43 min

Route data: © OpenStreetMap contributors.

  • Poland165 km · 1 h 55 min

    Main roads: 5, A 4, A4

  • Germany647 km · 6 h 8 min

    Main roads: A 4, A 72, A 8, A 9, A 93, A 99

  • Austria109 km · 1 h 25 min

    Main roads: A12, A13

  • Italy186 km · 2 h 14 min

    Main roads: A22, SS240

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 58 kilometres (km 276–334, Germany).

This stretch relies on community data, which may be incomplete.

EvCompassHow we calculate →

  • Poland

    23 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (23)
    • km 0–10 · Wrocław · 13 sites · up to 320 kW · GreenWay Polska Sp. z o.o., Eleport Sp. z o.o., Porsche Centrum Wrocław Lellek Group and 2 more
    • km 25–26 · Kąty Wrocławskie · 3 sites · up to 400 kW · GreenWay Polska Sp. z o.o.
    • km 71 · Shell Recharge 5109 Legnicka, Nowa Wieś Legnicka · Shell Polska Sp z o.o. · 190 kW
    • km 102–107 · Okmiany · 3 sites · up to 400 kW · GreenWay Polska Sp. z o.o. and ANWIM S.A.
    • km 162 · Zgorzelec · 3 sites · up to 400 kW · ORLEN S.A., IONITY GmbH Sp. z o.o., and GreenWay Polska Sp. z o.o.
    Map Poland: 23 stations in the corridor
  • Germany

    41 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (41)
    • km 167 · Gottlieb-Daimler-Straße 12, Görlitz · 150 kW
    • km 173 · Aral Kodersdorf · Aral pulse · 350 kW
    • km 209 · Schliebenstraße 24, Bautzen · 150 kW
    • km 252 · Dresdner Straße 49, Ottendorf-Okrilla · Shell Recharge Solutions · 150 kW
    • km 264–266 · Dresden · 2 sites · up to 150 kW
    • km 276 · Wilsdruff · 2 sites · up to 350 kW · Ionity
    • km 334 · Tesla Supercharger Chemnitz-Center · 250 kW
    • km 342 · Carl-von-Bach-Straße, Chemnitz · 350 kW
    • km 368 · Arno-Schmidt-Straße, Wildenfels · EnBW · 300 kW
    • km 406 · Tesla Supercharger Plauen · 250 kW
    • km 442 · Autohof Bayerisches Vogtland / Selbitz, Selbitz-Sellanger · Allego BV · 300 kW
    • km 457 · Münchberg-Nord Supercharger · Tesla · 250 kW
    • km 478 · IONITY Himmelkron · 350 kW
    • km 489–492 · Bayreuth · 2 sites · up to 250 kW · Tesla and Comfortcharge
    • km 529 · Fastned Plech · 175 kW
    • km 570 · Tesla Supercharger Feucht · 250 kW
    • km 594 · Tesla Supercharger Hilpoltstein, Landkreis Roth · 250 kW
    • km 609–610 · Greding · 2 sites · up to 250 kW · Tesla and EnBW
    • km 637–644 · Hepberg · 4 sites · up to 350 kW · Ionity, Tesla, and EnBW
    • km 659 · Reichertshofen · 2 sites · up to 300 kW · EWE and Tesla
    • km 686 · Tesla Supercharger Allershausen · 250 kW
    • km 701 · Eching · 3 sites · up to 350 kW · EnBW, Tesla, and Ionity
    • km 707 · Ionity Garching, Garching bei München · 350 kW
    • km 724 · Tesla Supercharger Vaterstetten · 250 kW
    • km 738 · Tesla Supercharger Brunnthal · 250 kW
    • km 754–756 · Holzkirchen · 3 sites · up to 350 kW · Ionity and Tesla
    • km 771 · DINZLER Kaffeerösterei AG Irschenberg · ladenetz.de · 150 kW
    • km 786 · Tesla Supercharger Rosenheim · 250 kW
    • km 810 · EWE Go Kiefersfelden · 150 kW
    Map Germany: 41 stations in the corridor
  • Austria

    8 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (8)
    • km 826 · IONITY Angath Nord · 350 kW
    • km 861 · Fastcharger ENI Gutmann Vomp, Marktgemeinde Vomp · da emobil · 150 kW
    • km 882–895 · Innsbruck · 5 sites · up to 250 kW · Tesla, SMATRICS Netz, and Be Energised
    • km 920 · SHELL FAST BRENNERSTRASSE 245, Gries · Shell Recharge Solutions · 300 kW
    Map Austria: 8 stations in the corridor
  • Italy

    15 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (15)
    • km 921 · Ionity Brenner, Brennero · 350 kW
    • km 959 · Varna · 3 sites · up to 400 kW · EnBW and Tesla
    • km 984 · Isarco Est, Castelrotto · 150 kW
    • km 1,004–1,006 · BolBolzano · 2 sites · up to 400 kW · Tesla and Alperia
    • km 1,050–1,058 · Trento · 5 sites · up to 350 kW · Tesla, Ionity, and iPlanet
    • km 1,087 · Supercharger Tesla Rovereto · Tesla · 250 kW
    • km 1,106–1,107 · Riva del Garda · 2 sites · up to 300 kW · iPlanet and Alperia
    Map Italy: 15 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

Priced one-way road charges for a passenger BEV: PLN 96. Not included: A22 (Brennero–Rovereto Sud).

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

No fixed road charge applies to this route.

Germany

  • Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    Fastned

  • IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

No fixed road charge applies to this route.

Austria

  • IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Italy

  • Fastned: 0.83 EUR/kWh; PLN equivalent 3.6 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    Fastned

  • IONITY: up to 0.91 EUR/kWh (list price, no subscription); up to 3.95 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 95 km/h.

Other routes

Other destinations

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy