Skip to content
EvCompass

Italy: Riva del Garda

4 versions with route calculations

The drive from Warsaw to Riva del Garda is 1,403 km. Austria accounts for 498 km across two sections, 389 km and 109 km, separated by 95 km in Germany; the final 186 km run through Italy.

Vignettes are required in Czechia and Austria, while Germany's federal toll does not apply to ordinary passenger cars. The Austrian A13 over the Brenner has a section toll. Italy's A22 charges according to distance travelled towards Rovereto Sud.

Route

Distance and driving time

Total distance
1,205 km
Total driving time
12 h 25 min

Route data: © OpenStreetMap contributors.

  • Poland169 km · 1 h 46 min

    Main roads: A 12, A2, S11, S5

  • Germany740 km · 7 h

    Main roads: A 10, A 12, A 8, A 9, A 93, A 99

  • Austria109 km · 1 h 25 min

    Main roads: A12, A13

  • Italy186 km · 2 h 14 min

    Main roads: A22, SS240

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 44 kilometres (km 84–128, Poland).

EvCompassHow we calculate →

  • Poland

    22 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (22)
    • km 0–9 · Poznań · 9 sites · up to 400 kW · GreenWay Polska Sp. z o.o., Eleport Sp. z o.o., Tesla Poland sp. z o.o. and 4 more
    • km 18 · Dopiewiec · 2 sites · up to 300 kW · Polenergia eMobility sp. z o.o.
    • km 28 · BP Niepruszewo · GreenWay Polska Sp. z o.o. · 200 kW
    • km 55 · A2 · 2 sites · up to 150 kW · ALLEGO POLAND SP. Z O. O.
    • km 83–84 · Rogoziniec · 2 sites · up to 400 kW · Polenergia eMobility sp. z o.o.
    • km 128 · A2 · 2 sites · up to 300 kW · ALLEGO POLAND SP. Z O. O.
    • km 164–167 · Słubice · 4 sites · up to 350 kW · IONITY GmbH Sp. z o.o., ANWIM S.A., ORLEN S.A. and 1 more
    Map Poland: 22 stations in the corridor
  • Germany

    58 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (58)
    • km 205 · Auto-Focus 3, Fürstenwalde · 175 kW
    • km 237 · Tesla Supercharger Wildau · 250 kW
    • km 245–249 · Mittenwalde · 2 sites · up to 350 kW · Ionity and FastNed
    • km 258–262 · Genshagen · 2 sites · up to 200 kW · Comfortcharge
    • km 278–282 · Michendorf · 3 sites · up to 175 kW · ladenetz.de, Innogy SE, and TotalEnergies
    • km 305 · IONITY Linthe · 350 kW
    • km 346 · Sandbreite 1, Coswig · TOTAL Be PlugToDrive · 175 kW
    • km 379 · Bitterfeld-Wolfen · 3 sites · up to 350 kW · Tesla, Ionity, and EnBW
    • km 406 · Schkeuditz · 3 sites · up to 300 kW · Tesla and Comfortcharge
    • km 420 · IONITY Nempitz, Saalekreis · 350 kW
    • km 444 · Raststätte Osterfeld Ost, Stößen · E.ON · 175 kW
    • km 452 · Autohof Im Heidegrund-Süd, Osterfeld · TOTAL Be PlugToDrive · 175 kW
    • km 462 · Petersberg · 2 sites · up to 300 kW · EnBW
    • km 472 · HPC Globus / Hermsdorf · 150 kW
    • km 490–491 · Triptis · 2 sites · up to 150 kW · Comfortcharge and Q1 Autostrom
    • km 513–514 · Schleiz · 3 sites · up to 300 kW · Allego BV and Tesla
    • km 536–541 · Berg · 2 sites · up to 300 kW · Allego BV
    • km 556 · Münchberg-Nord Supercharger · Tesla · 250 kW
    • km 577 · IONITY Himmelkron · 350 kW
    • km 588–591 · Bayreuth · 2 sites · up to 250 kW · Tesla and Comfortcharge
    • km 628 · Fastned Plech · 175 kW
    • km 669 · Tesla Supercharger Feucht · 250 kW
    • km 693 · Tesla Supercharger Hilpoltstein, Landkreis Roth · 250 kW
    • km 708 · Greding · 2 sites · up to 250 kW · Tesla and EnBW
    • km 735–743 · Hepberg · 4 sites · up to 350 kW · Ionity, Tesla, and EnBW
    • km 758 · Reichertshofen · 2 sites · up to 300 kW · EWE and Tesla
    • km 785 · Tesla Supercharger Allershausen · 250 kW
    • km 799 · Eching · 3 sites · up to 350 kW · EnBW, Tesla, and Ionity
    • km 806 · Ionity Garching, Garching bei München · 350 kW
    • km 822 · Tesla Supercharger Vaterstetten · 250 kW
    • km 837 · Tesla Supercharger Brunnthal · 250 kW
    • km 852–854 · Holzkirchen · 3 sites · up to 350 kW · Ionity and Tesla
    • km 870 · DINZLER Kaffeerösterei AG Irschenberg · ladenetz.de · 150 kW
    • km 885 · Tesla Supercharger Rosenheim · 250 kW
    • km 908 · EWE Go Kiefersfelden · 150 kW
    Map Germany: 58 stations in the corridor
  • Austria

    8 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (8)
    • km 924 · IONITY Angath Nord · 350 kW
    • km 960 · Fastcharger ENI Gutmann Vomp, Marktgemeinde Vomp · da emobil · 150 kW
    • km 980–993 · Innsbruck · 5 sites · up to 250 kW · Tesla, SMATRICS Netz, and Be Energised
    • km 1,019 · SHELL FAST BRENNERSTRASSE 245, Gries · Shell Recharge Solutions · 300 kW
    Map Austria: 8 stations in the corridor
  • Italy

    15 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (15)
    • km 1,019 · Ionity Brenner, Brennero · 350 kW
    • km 1,057–1,058 · Varna · 3 sites · up to 400 kW · EnBW and Tesla
    • km 1,083 · Isarco Est, Castelrotto · 150 kW
    • km 1,102–1,104 · BolBolzano · 2 sites · up to 400 kW · Tesla and Alperia
    • km 1,148–1,156 · Trento · 5 sites · up to 350 kW · Tesla, Ionity, and iPlanet
    • km 1,185 · Supercharger Tesla Rovereto · Tesla · 250 kW
    • km 1,204–1,205 · Riva del Garda · 2 sites · up to 300 kW · iPlanet and Alperia
    Map Italy: 15 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

Priced one-way road charges for a passenger BEV: PLN 155. Not included: A22 (Brennero–Rovereto Sud).

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

Germany

  • Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    Fastned

  • IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

No fixed road charge applies to this route.

Austria

  • IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Italy

  • Fastned: 0.83 EUR/kWh; PLN equivalent 3.6 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    Fastned

  • IONITY: up to 0.91 EUR/kWh (list price, no subscription); up to 3.95 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 97 km/h.

Other routes

Other destinations

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy