- Home
- Electric car routes abroad
- Germany: Berlin
Route abroad
Germany: Berlin
Route
Distance and driving time
- Total distance
- 576 km
- Total driving time
- 5 h 58 min
Router: OSRM public routing service. Measured: Sep 14, 2026. Route source
Route data: © OpenStreetMap contributors.
| Country | Distance | Driving time | Main roads |
|---|---|---|---|
| Poland | 477 km | 4 h 43 min | 29, 7, A2, B 5, S2, S8 |
| Germany | 99 km | 1 h 15 min | A 10, A 100, A 113, A 12, B 1, B 87 |
Charging along the route
DC sites along the route corridor
Sites are within 3 km of the route; counts do not represent complete coverage.
Poland
51 sites of at least 150 kW in our map data on Sep 15, 2026
Official-source data
Sources: EIPA.
Source data date: Sep 11, 2026.
Open the charging mapGermany
12 sites of at least 150 kW in our map data on Sep 15, 2026
Community fallback data
Sources: Open Charge Map.
Source data date: Sep 3, 2026.
Open the charging map
Models
Stops, charging time and cost
Versions of the Toyota bZ4X family.
| Vehicle version | Winter · −10 °C | Summer · 23 °C |
|---|---|---|
Country breakdown: Toyota bZ4X FWD 57.7 kWh (2025), Winter · −10 °C
|
Country breakdown: Toyota bZ4X FWD 57.7 kWh (2025), Summer · 23 °C
| |
Country breakdown: Toyota bZ4X FWD 73.1 kWh (2025), Winter · −10 °C
|
Country breakdown: Toyota bZ4X FWD 73.1 kWh (2025), Summer · 23 °C
| |
Country breakdown: Toyota bZ4X AWD 73.1 kWh (2025), Winter · −10 °C
|
Country breakdown: Toyota bZ4X AWD 73.1 kWh (2025), Summer · 23 °C
|
Prices and road charges
Charging prices and road charges
Poland
National EIPA DC median: PLN 2.52; snapshot dated Sep 17, 2026.
Road charges
A1 AmberOne for passenger car: amount depends on the route; BEV exemption: unknown; validity: validity dates not supplied; verified: Sep 14, 2026.
Source: AmberOne A1
A2 concession motorway for passenger car: amount depends on the route; BEV exemption: unknown; validity: validity dates not supplied; verified: Sep 14, 2026.
Source: Autostrada Wielkopolska
A4 Katowice–Kraków toll for two-axle passenger car: PLN 18.00 per toll plaza × 2 (PLN 36.00 for the full section); BEV exemption: no; validity: from Apr 1, 2026; verified: Sep 15, 2026.
Source: Stalexport Autostrada Małopolska (A4)
Germany
Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 PLN/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
Source: Fastned
Road charges
passenger car: no road charge; BEV exemption: not applicable; verified: Sep 14, 2026.
Source: Toll Collect
Assumptions
Calculation assumptions
- Stops are modelled and are not real charger locations.
- Start charge 90%, arrival reserve 15%, charge target 80%.
- Winter: -10 °C; summer: 23 °C.
- Average speed used in the calculation: 97 km/h.
- Energy added before departure is not included in the cost.
- One-way trip.