Skip to content
EvCompass

Austria: Zell am See

2 versions with route calculations

The drive from Warsaw to Zell am See is 1,084 km. The longest single leg through Austria is 389 km; the route then enters Germany for 23 km, and the final 49 km run through Austria again.

Vignettes are required on the used motorways in Czechia and Austria. In Czechia, an electric car may qualify for an exemption after prior notification, while Austria has no general exemption for electric cars. Germany's federal toll applies to certain goods vehicles over 3.5 tonnes, not ordinary passenger cars.

Route

Distance and driving time

Total distance
732 km
Total driving time
9 h 47 min

Route data: © OpenStreetMap contributors.

  • Poland126 km · 2 h 21 min

    Main roads: 5, 8, A4, S8

  • Czechia337 km · 4 h

    Main roads: 14, 157, 243, 3, 33, 603, 8, D0, D1, D11

  • Austria198 km · 2 h 18 min

    Main roads: 163, 603, A1, A7, B1, B310, D3, S10

  • Germany23 km · 23 min

    Main roads: B 20, B 21

  • Austria49 km · 45 min

    Main roads: B164, B178, B311

Charging along the route

DC sites along the route corridor

Longest stretch without a ≥150 kW site on the route: 260 kilometres (km 10–270, Poland and Czechia).

This stretch relies on community data, which may be incomplete.

EvCompassHow we calculate →

  • Poland

    13 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    EIPA

    ≥150 kW sites on the route (13)
    • km 0–10 · Wrocław · 13 sites · up to 320 kW · GreenWay Polska Sp. z o.o., Eleport Sp. z o.o., Porsche Centrum Wrocław Lellek Group and 2 more
    Map Poland: 13 stations in the corridor
  • Czechia

    8 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (8)
    • km 270 · Chlumecká, Praha · PRE · 150 kW
    • km 282 · Power Point Pankrác, Prague · PRE · 300 kW
    • km 295 · IONITY Nupaky · 350 kW
    • km 323 · Elmoz Czech s.r.o. Benešov · 180 kW
    • km 347 · E.ON Drive Miličín · 150 kW
    • km 369 · Innogy Tábor · 400 kW
    • km 395 · E.ON Drive, Veselí nad Lužnicí · 150 kW
    • km 435 · Tesla Supercharger Kamenný Újezd · 250 kW
    Map Czechia: 8 stations in the corridor
  • Austria

    11 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW sites on the route (11)
    • km 511 · Spar Mittertreffling · EnBW · 180 kW
    • km 531–532 · Ansfelden · 2 sites · up to 350 kW · SMATRICS Netz and Ionity
    • km 557–561 · Sattledt · 3 sites · up to 350 kW · da emobil, Tesla, and Ionity
    • km 604 · Ionity St. Georgen · 350 kW
    • km 620 · IONITY Mondsee, Innerschwand am Mondsee · 350 kW
    • km 643 · Has·to·be EC, Eugendorf · Be Energised · 150 kW
    • km 649 · Tesla Supercharger Salzburg · 250 kW
    • km 657 · Kinostraße, Salzburg-Umgebung · SMATRICS Netz · 175 kW
    Map Austria: 11 stations in the corridor
  • Germany

    1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    Open Charge Map

    ≥150 kW site on the route (1)
    • km 664 · Tesla Supercharger Piding · 250 kW
    Map Germany: 1 station in the corridor
  • Austria

    0 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026

    No data sources.

    Map Austria: 0 stations in the corridor

Models

Stops, charging time and cost

Prices and road charges

Charging prices and road charges

EvCompassHow we calculate →

One-way road charges for a passenger BEV: PLN 42.

NBP 178/A/NBP/2026

Poland

National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.

EIPA

No fixed road charge applies to this route.

Czechia

  • IONITY: up to 22.68 CZK/kWh (list price, no subscription); up to 4.05 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Austria

  • IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

Germany

  • Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    Fastned

  • IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.

    IONITY

No fixed road charge applies to this route.

Apps that support multiple charging networks

Publisher information checked September 24, 2026

Assumptions

Calculation assumptions

  • Start charge 90%, arrival reserve 15%, charge target 80%.
  • Winter: -10 °C; summer: 23 °C.
  • Average speed used in the calculation: 75 km/h.

Other routes