Electromaps
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayThe drive from Warsaw to Zell am See is 1,084 km. The longest single leg through Austria is 389 km; the route then enters Germany for 23 km, and the final 49 km run through Austria again.
Vignettes are required on the used motorways in Czechia and Austria. In Czechia, an electric car may qualify for an exemption after prior notification, while Austria has no general exemption for electric cars. Germany's federal toll applies to certain goods vehicles over 3.5 tonnes, not ordinary passenger cars.
Route
Route data: © OpenStreetMap contributors.
Poland388 km · 3 h 58 min
Main roads: 7, 78, A1, A2, S2, S8
Czechia237 km · 2 h 43 min
Main roads: 152, 52, 67, 78, B7, D1, D2
Austria389 km · 4 h 7 min
Main roads: A1, A22, A5, B1, B7, S1, S33, S5
Germany23 km · 23 min
Main roads: B 20, B 21
Austria49 km · 45 min
Main roads: B164, B178, B311
| Country | Distance | Driving time | Main roads |
|---|---|---|---|
| Poland | 388 km | 3 h 58 min | 7, 78, A1, A2, S2, S8 |
| Czechia | 237 km | 2 h 43 min | 152, 52, 67, 78, B7, D1, D2 |
| Austria | 389 km | 4 h 7 min | A1, A22, A5, B1, B7, S1, S33, S5 |
| Germany | 23 km | 23 min | B 20, B 21 |
| Austria | 49 km | 45 min | B164, B178, B311 |
Charging along the route
Longest stretch without a ≥150 kW site on the route: 255 kilometres (km 416–671, Czechia and Austria).
This stretch relies on community data, which may be incomplete.
EvCompassHow we calculate →
46 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
EIPA
1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
16 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
0 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
No data sources.
Map Austria: 0 stations in the corridorModels
| Vehicle version | Winter · −10 °C | Summer · 23 °C | ||||
|---|---|---|---|---|---|---|
| Stops | Charging time | Total cost | Stops | Charging time | Total cost | |
| 4 stops | 1 h 16 min | up to PLN 493 By country
| 3 stops | 57 min | up to PLN 340 By country
| |
| 3 stops | 58 min | up to PLN 453 By country
| 2 stops | 39 min | up to PLN 337 By country
| |
| 3 stops | 1 h 4 min | up to PLN 499 By country
| 2 stops | 42 min | up to PLN 404 By country
| |
| 3 stops | 1 h 4 min | up to PLN 499 By country
| 2 stops | 42 min | up to PLN 404 By country
| |
Prices and road charges
EvCompassHow we calculate →
One-way road charges for a passenger BEV: PLN 42.
National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.
EIPA
No fixed road charge applies to this route.
IONITY: up to 22.68 CZK/kWh (list price, no subscription); up to 4.05 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
Fastned: 0.69 EUR/kWh; PLN equivalent 2.99 zł/kWh; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.76 EUR/kWh (list price, no subscription); up to 3.3 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
No fixed road charge applies to this route.
Publisher information checked September 24, 2026
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayPublisher: Elocity Sp. z o.o.
Countries: 1 country
App StoreGoogle PlayPublisher: GreenWay Slovensko s. r. o.
Countries: 3 countries
App StoreGoogle PlayPublisher: ANWIM S.A.
Countries: 1 country
App StoreGoogle PlayAssumptions
EvCompassHow we calculate →