- Power
- 60–160 kW
- Price
- from PLN 92,250–164,256
Independent heavy-vehicle dossier
Mercedes-Benz Trucks eEconic
336 kWh and 150 km in mixed operation, but only 100 km in pure refuse collection — the eEconic quotes both figures.
Image 1 of 2
150 km
Range
manufacturer claim
160 kW
DC charging
330 kW
Continuous power
6x2
Axle configuration
Buying decision
The EvCompass verdict
The key arguments drawn from the published data and the EvCompass editorial summary.
That gap shows where the energy actually goes: in refuse collection the vehicle powers a compactor and stops constantly, so kilometres are the worst possible measure of its work. The low entry is a safety requirement for the loading crew, not styling. In series production at Wörth since July 2022.
Strengths
- Range quoted separately for collection and for mixed operation.
Weaknesses
- Range falls from 150 km in mixed operation to 100 km in refuse collection, so body and duty cycle change the usable result.
The full picture
Specifications
Manufacturer-published facts grouped by the decisions they inform, without raw source headings.
Battery and charging
- Gross battery
- 336 kWh
- DC charging
- 160 kW
- On charging
- CCS, max. 160 kW; 20-80 % in approx. 75 min (mfr).
Powertrain
- Powertrain
- Battery electric
- Continuous power
- 330 kW
- Peak power
- 400 kW
- Axle configuration
- 6x2
Mass and load
- Gross vehicle weight
- 27,000 kg
- Payload
- 17,700 kg
Market and year
- Model year from
- 2,022
- Markets
- EU, PL, UK
- Production status
- In production
- Vehicle class
- N3
- Measurement basis
- Manufacturer: up to 100 km in pure urban refuse-collection duty and up to 150 km in mixed operation, with three battery packs. Mercedes states the range covers the vast majority of typical refuse-collection routes without charging en route. Headline figure taken as the 150 km mixed-operation number; the 100 km figure is the refuse-collection case.
These are manufacturer-published figures gathered through EvCompass research.
Price and availability
What it costs and whether it is available in Poland
Published price evidence and the Polish availability answer, kept together for a buying decision.
The manufacturer publishes no price for this vehicle.
In heavy transport that is the rule rather than the exception — makers quote on request.
No public list price. Municipal eEconic purchases in Germany are typically tendered and were supported by the KsNI funding programme, but no per-unit figure was found during research.
Poland
Polish availability not established
Not confirmed. The eEconic is a Europe-wide Mercedes-Benz Trucks product built at Woerth and the Polish MB Trucks organisation sells the Econic range, but no Polish eEconic listing, homologation statement or municipal delivery was found during research. Treat availability in Poland as unverified.
Charging infrastructure
Recommended chargers
Chargers matched to the vehicle's published power or to a clearly stated duty profile when that figure is missing.
This vehicle charges at up to 160 kW DC — the chargers below are matched to that figure.
- Power
- 160–180 kW
- Price
- from PLN 175,942–187,057
- Power
- 160–240 kW
- Price
- from PLN 189,511–217,254
Sources and research
Research notes
The sources and research notes behind the figures, claims and editorial assessment.
Municipal low-entry heavy rigid, series production at Woerth since July 2022 (second battery-electric Mercedes-Benz truck after the eActros); trade-show premiere at IFAT Munich on 30.05.2022. Shares its drivetrain with the first-generation eActros 300: three battery packs, 336 kWh installed, Mercedes electric rigid axle with two motors and a two-speed (plus two reverse) transmission, 330 kW continuous / 400 kW peak, 160 kW CCS charging. IMPORTANT: the first-generation eActros 300/400 were discontinued at the end of 2025, but Mercedes-Benz Trucks explicitly confirmed the eEconic continues in production on the same hardware. Two configurations: 6x2/4 ENA three-axle at 27 t GVW (kerb 9.2 t, payload approx. 17.7 t) - the record's headline - and a 4x2 two-axle at 19 t GVW (kerb 8.1 t, payload approx. 10.9 t), which would be N3 as well. Top speed 89 km/h. The 530 Nm figure Mercedes publishes is the 60-second peak torque available at the MECHANICAL PTO for driving a refuse-body superstructure, NOT the traction motor torque - torqueNm is therefore left null to avoid a misleading comparison. Battery chemistry is stated as lithium-ion; NMC is inferred from the shared first-generation eActros pack (CB400) rather than stated for the eEconic specifically - treat as MEDIUM confidence. Related: Mercedes-Benz Trucks also unveiled a 'reECONIC', a battery-electric eEconic demonstrator built from recycled materials (circular-economy showcase, not a separate model).
Data confidence
MEDIUM
Sources
- https://www.mercedes-benz-trucks.com/int/en/trucks/eeconic.html
- https://www.daimlertruck.com/en/newsroom/pressrelease/electric-in-series-production-the-mercedes-benz-eeconic-rolls-off-the-production-line-at-the-woerth-plant-as-of-now-51999044
- https://www.daimlertruck.com/en/newsroom/pressrelease/striding-towards-series-production-trials-of-the-mercedes-benz-eeconic-for-fully-electric-operation-in-municipal-use-are-in-full-swing-50873519
- https://www.daimlertruck.com/en/innovation/powertrain/our-eportfolio


