Independent heavy-vehicle dossier
Futuricum (Designwerk) Collect 26E Large
340 kWh and 190 kWh per 100 km in refuse duty — the Collect 26E went to Basel in twelve units.
Image 1 of 3
6x2
Axle configuration
Buying decision
The EvCompass verdict
The key arguments drawn from the published data and the EvCompass editorial summary.
Basel's council approved about 19 million francs for the first twelve vehicles together with chargers — one of the few public sums in this database, but it covers infrastructure, so it is not a vehicle price. The 190 kWh per 100 km cannot be compared with a tractor: a refuse truck powers a body and stands still more than it drives. Replaced by the Low Cab.
Strengths
- Consumption of 190 kWh/100 km was measured in refuse-collection work, giving the Collect 26E at least one concrete operating point.
Weaknesses
- The manufacturer publishes no range, and the 190 kWh/100 km figure was measured without a body, so it does not describe a finished refuse truck.
The full picture
Specifications
Manufacturer-published facts grouped by the decisions they inform, without raw source headings.
Battery and charging
- Gross battery
- 340 kWh
- Consumption
- 190 kWh/100 km
- On charging
- Charging peak not published for this generation.
Powertrain
- Powertrain
- Battery electric
- Peak power
- 500 kW
- Axle configuration
- 6x2
Mass and load
- Gross vehicle weight
- 26,000 kg
Market and year
- Model year from
- 2,020
- Markets
- CH
- Production status
- Discontinued
- Vehicle class
- N3
- Measurement basis
- No range figure published; Designwerk quotes 190 kWh/100 km in refuse-collection duty, which implies roughly 175 km from 340 kWh gross but that is a derivation, not a manufacturer figure
These are manufacturer-published figures gathered through EvCompass research.
Price and availability
What it costs and whether it is available in Poland
Published price evidence and the Polish availability answer, kept together for a buying decision.
The manufacturer publishes no price for this vehicle.
In heavy transport that is the rule rather than the exception — makers quote on request.
The Grand Council of the City of Basel approved a budget of about CHF 19 m (roughly EUR 17 m) for the first twelve Collect 26E refuse trucks PLUS the associated charging stations - about CHF 1.6 m per truck-and-charger package, and Basel later reported the actual procurement came in around 30 % cheaper than budgeted. This is a bundled municipal budget line, not a vehicle list price.
Source: electrive.com, reporting the City of Basel procurementPoland
Not available in Poland
Never offered in Poland.
Charging infrastructure
Recommended chargers
Chargers matched to the vehicle's published power or to a clearly stated duty profile when that figure is missing.
This vehicle does not publish its own DC charging power. The chargers below are matched to a charging profile typical for this class of vehicle (around 350 kW), not to a figure this vehicle publishes.
- Power
- 360 kW
- Price
- PLN 307,500
- Power
- 160–240 kW
- Price
- from PLN 189,511–217,254
Sources and research
Research notes
The sources and research notes behind the figures, claims and editorial assessment.
26 t electric refuse collector, 500 kW output, two 170 kWh packs in the Large version = 340 kWh, 190 kWh/100 km in collection duty. Twelve units ordered by the City of Basel, first deliveries from end-2020. Superseded in the current catalogue by the Econic-based Low Cab. IMAGE GAP: no direct-file URLs found. PRICE IS THE BEST DATA POINT IN THIS GROUP but it is a bundled municipal budget covering trucks plus charging infrastructure, so treat the per-unit figure as indicative only.