In productionBattery electricTractorN3 — may qualify · up to PLN 750,000

Independent heavy-vehicle dossier

Ashok Leyland AVTR 55T EV 5530 AN

302.5 kWh of battery and only 180 km of range at 55 tonnes of combination weight — the AVTR shows what electrification looks like under Indian conditions.

Image 1 of 2

Ashok Leyland AVTR 55T EV 5530 AN — Side profile

Image 1 of 2

180 km

Range

manufacturer claim

55 t

Combination weight

1,500 Nm

Torque

4x2

Axle configuration

Buying decision

The EvCompass verdict

The key arguments drawn from the published data and the EvCompass editorial summary.

That ratio is the point: 302.5 kWh giving 180 km implies a consumption at which European tractors travel twice as far — because the AVTR pulls 55 tonnes, not 40. This is a vehicle for short, heavy industrial runs, not for the road. The manufacturer publishes neither a test cycle nor a price.

Strengths

  • Peak power of 220 kW and 1,500 Nm of torque are stated for a 55 t GCW combination, so the drivetrain has clearly defined parameters under heavy load.

Weaknesses

  • 180 km of range confines this vehicle to an industrial cycle.

The full picture

Specifications

Manufacturer-published facts grouped by the decisions they inform, without raw source headings.

Battery and charging

Gross battery
302.5 kWh
On charging
Dual charging guns to CCS2. Peak kW and charge time not published. No battery swap.

Powertrain

Powertrain
Battery electric
Peak power
220 kW
Torque
1,500 Nm
Axle configuration
4x2

Mass and load

Combination weight
55,000 kg

Market and year

Model year from
2,024
Markets
IN
Production status
In production
Vehicle class
N3
Measurement basis
Manufacturer: up to 180 km. No test cycle or payload stated - a short-range regional/industrial duty cycle, not long-haul.

These are manufacturer-published figures gathered through EvCompass research.

Price and availability

What it costs and whether it is available in Poland

Published price evidence and the Polish availability answer, kept together for a buying decision.

The manufacturer publishes no price for this vehicle.

In heavy transport that is the rule rather than the exception — makers quote on request.

No published price found.

Poland

Not available in Poland

India-only. Ashok Leyland sells no heavy trucks in Poland or the EU.

Charging infrastructure

Recommended chargers

Chargers matched to the vehicle's published power or to a clearly stated duty profile when that figure is missing.

This vehicle does not publish its own DC charging power. The chargers below are matched to a charging profile typical for this class of vehicle (around 350 kW), not to a figure this vehicle publishes.

Browse all chargers

Sources and research

Research notes

The sources and research notes behind the figures, claims and editorial assessment.

IMAGE GAP - only one official image found; Ashok Leyland has no public press image library for this model. Battery: 302.5 kWh at 650 V per Ashok Leyland's own product page; trade press (WagenClub) quotes 301.5 kWh - manufacturer figure used. IP67-rated packs. PMSM rated 220 kW / 1,500 Nm with a 4-speed automatic gearbox, top speed 85 km/h, GCW 55 t. First Indian heavy truck from Ashok Leyland fitted with ADAS. Delivered to Billion Electric Mobility from October 2024 alongside electric BOSS rigids. Note the same customer (BillionE / Billion Electric Mobility) is buying from both Ashok Leyland and Tata - it is the anchor fleet for Indian heavy electric trucking.

Optional GA4 analytics helps us understand catalog usage. Advertising features remain disabled. Read our privacy policy