Electromaps
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayThe drive from Warsaw to Split is 1,466 km. Its longest single leg runs through Croatia and measures 465 km; the remaining sections pass through Poland, Czechia, Austria and Slovenia.
E-vignettes apply on motorways in Czechia, Austria and Slovenia. Croatian motorways charge by the distance between toll points and by vehicle category. The route crosses Slovenia on a 60 km stretch, and the Slovenian e-vignette is sold for 7 days, a month or a year.
Route
Route data: © OpenStreetMap contributors.
Poland388 km · 3 h 58 min
Main roads: 7, 78, A1, A2, S2, S8
Czechia237 km · 2 h 43 min
Main roads: 152, 52, 67, 78, B7, D1, D2
Austria317 km · 3 h 38 min
Main roads: 437, A1, A2, A23, A5, A9, B7, S1, S2
Slovenia60 km · 40 min
Main roads: A1, A4
Croatia465 km · 5 h 5 min
Main roads: A1, A2, A4, D1, D410, D8
| Country | Distance | Driving time | Main roads |
|---|---|---|---|
| Poland | 388 km | 3 h 58 min | 7, 78, A1, A2, S2, S8 |
| Czechia | 237 km | 2 h 43 min | 152, 52, 67, 78, B7, D1, D2 |
| Austria | 317 km | 3 h 38 min | 437, A1, A2, A23, A5, A9, B7, S1, S2 |
| Slovenia | 60 km | 40 min | A1, A4 |
| Croatia | 465 km | 5 h 5 min | A1, A2, A4, D1, D410, D8 |
Charging along the route
Longest stretch without a ≥150 kW site on the route: 255 kilometres (km 416–671, Czechia and Austria).
This stretch relies on community data, which may be incomplete.
EvCompassHow we calculate →
46 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
EIPA
1 site of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
6 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
2 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
20 sites of at least 150 kW within 3 km of the route in our map data on Nov 9, 2026
Open Charge Map
Models
| Vehicle version | Winter · −10 °C | Summer · 23 °C | ||||
|---|---|---|---|---|---|---|
| Stops | Charging time | Total cost | Stops | Charging time | Total cost | |
| 6 stops | 3 h 2 min | up to PLN 869 By country
| 4 stops | 2 h 1 min | up to PLN 542 By country
| |
| 6 stops | 3 h 19 min | up to PLN 928 By country
| 4 stops | 2 h 12 min | up to PLN 581 By country
| |
| 7 stops | 3 h 32 min | up to PLN 1,050 By country
| 5 stops | 2 h 32 min | up to PLN 729 By country
| |
| 7 stops | 3 h 32 min | up to PLN 1,050 By country
| 5 stops | 2 h 32 min | up to PLN 729 By country
| |
Prices and road charges
EvCompassHow we calculate →
One-way road charges for a passenger BEV: PLN 255.
National EIPA DC median: PLN 2.52; snapshot dated Nov 10, 2026.
EIPA
No fixed road charge applies to this route.
IONITY: up to 22.68 CZK/kWh (list price, no subscription); up to 4.05 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.75 EUR/kWh (list price, no subscription); up to 3.25 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.78 EUR/kWh (list price, no subscription); up to 3.38 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
IONITY: up to 0.81 EUR/kWh (list price, no subscription); up to 3.51 zł/kWh PLN equivalent; NBP rate dated Sep 14, 2026; verified Sep 14, 2026.
Publisher information checked September 24, 2026
Publisher: Wallbox Chargers S.L.
App StoreGoogle PlayPublisher: Elocity Sp. z o.o.
Countries: 1 country
App StoreGoogle PlayPublisher: GreenWay Slovensko s. r. o.
Countries: 3 countries
App StoreGoogle PlayPublisher: ANWIM S.A.
Countries: 1 country
App StoreGoogle PlayAssumptions
EvCompassHow we calculate →